WorkspaceSites
KPI PANEL
All sites
CORPORATE / SITE #234

Madeira Port

Location details and connected equipment.

STATUSEnabledCorporate
INSTALLED POWER0Reported by the site
CONNECTED DEVICES5Devices assigned to this site

Site information

Type
Corporate
Contracted power
0
Charger power
0
Three phase
No
Solar PV
No
Battery storage
No
Coordinates
—
Tariff
Configuration
ACTIVE POWER

Consumption and production forecasts

Time range

Compare aggregated power with its forecast for up to one month.

Some forecast devices are unavailable
No device at this site has the “consumption” forecast tag. No device at this site has the “pv” forecast tag.

Consumption vs forecast

15-minute average active power compared with the consumption forecast.

0 points
No data for this rangeNeither aggregated nor forecast values were returned.
FORECAST ERROR

Consumption accuracy

Metrics unavailable
Error metrics need aggregated and forecast values.

Production vs forecast

15-minute average active power compared with the PV production forecast.

0 points
No data for this rangeNeither aggregated nor forecast values were returned.
FORECAST ERROR

Production accuracy

Metrics unavailable
Error metrics need aggregated and forecast values.